Wooden plugs driven into holes in masonry, concrete, plaster, or similar materials shall not be used for what purpose?
- Insulating electrical splices
- Providing cooling for electrical equipment
- Marking electrical equipment
- Securing electric equipment to a surface (correct answer)
Electric equipment shall be firmly secured to the surface on which it is mounted. Wooden plugs driven into holes in masonry, concrete, plaster, or similar materials shall not be used.
Electric equipment shall be firmly secured to the surface on which it is mounted. Wooden plugs driven into holes in masonry, concrete, plaster, or similar materials shall not be used.
For equipment designed for floor mounting, what clearance shall be provided between top surfaces and adjacent surfaces?
- To prevent air flow obstruction
- To allow for electrical splicing
- To dissipate rising warm air (correct answer)
- To ensure proper marking durability
For equipment designed for floor mounting, clearance between top surfaces and adjacent surfaces shall be provided to dissipate rising warm air.
For equipment designed for floor mounting, clearance between top surfaces and adjacent surfaces shall be provided to dissipate rising warm air.
What must be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose?
- Parts producing arcs, sparks, flames, or molten metal
- All splices and joints and the free ends of conductors (correct answer)
- All electrical equipment
- The manufacturer's name or trademark on equipment
All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.
All splices and joints and the free ends of conductors shall be covered with an insulation equivalent to that of the conductors or with an insulating device designed for the purpose.
What is the minimum headroom of working spaces about service equipment, switchboards, panelboards, or motor control centers?
- 8 feet 0 inches
- 7 feet 0 inches
- 5 feet 6 inches
- 6 feet 3 inches (correct answer)
The minimum headroom of working spaces about service equipment, switchboards, panelboards, or motor control centers shall be 6 feet 3 inches. This is stated in section (v).
(v) Headroom. The minimum headroom of working spaces about service equipment, switchboards, panelboards, or motor control centers shall be 6 feet 3 inches (1.91 m).
What is the minimum clear workspace high when energized parts are exposed?
- 914 mm
- 6 feet 6 inches (correct answer)
- 1.98 m
- 3 feet
The minimum clear workspace shall not be less than 6 feet 6 inches (1.98 m) high when energized parts are exposed. This measurement is taken vertically from the floor or platform.
Where energized parts are exposed, the minimum clear workspace shall not be less than 6 feet 6 inches (1.98 m) high (measured vertically from the floor or platform), or less than 3 feet (914 mm) wide (measured parallel to the equipment).
Other topics on this test
-
Fall protection (Subpart M)30 questionsPractice
-
Scaffolds (Subpart L)55 questionsPractice
-
Stairways and ladders (Subpart X)32 questionsPractice
-
Excavations and trenching (Subpart P)51 questionsPractice
-
General safety, PPE and fire protection52 questionsPractice
Sources
Current text, retrieved November 16, 2026
This is an independent OSHA construction safety practice test based on 29 CFR Part 1926, not an official OSHA Outreach certification. ExamVerdict is not affiliated with Occupational Safety and Health Administration (OSHA). Check the official material before test day.